Belfast International Airport - Phase 1 Taxiway Rehabilitation
LAML was contracted to undertake saw AGL cable chasing, saw cutting and AGL seating pot installation. The works were carried out under limited airside possession periods.
Glasgow Prestwick Airport - General Airport Maintenance
Glasgow Prestwick Airport engaged with LAML to review their existing asphalt and concrete infrastructure including undertaking a detailed runway survey. LAML proposed a 5-year maintenance plan for the client to enable them to prolong the life expectancy of their current infrastructure without having to commit major capital expenditure at this current point in time.
Cambridge City Airport Life Extension Works
Cambridge City Airport Life Extension Works. Marshall Aerospace Group, the Company that owns Cambridge City Airport contracted LAML to undertake various cost-effective life extension works on several Taxiways and the Runway.
Dublin Airport North Apron Project
LAML was contracted by Clare Civil Ltd to undertake saw cutting and sealing of new and existing Pavement Quality Concrete (PQC) bays, existing PQC slab repairs and removal of existing defective PQC bays.
Bristol Airport Runway & Taxiway General Maintenance
Our client had a package of surface maintenance and patching repairs to be carried out over a period of 5 /6 shifts in March of 2021 and 2022.
LAML acted in the role of Principal Contractor and our Project Manager was closely involved prior to works commencing.
Sumburgh Airport Airfield Ground Lighting
LAML was contracted by Lagan Aviation and Infrastructure to assist with the runway rehabilitation works at Sumburgh Airport.