DP World London Gateway

Works successfully delivered at DP World London Gateway.

Working collaboratively with our Client and key stakeholders our saw cut, sealing and coring works were phased to ensure that key programme dates were achieved whilst DP World Port operational certainty was maintained throughout. Our subcontract package included the following:

  • 30,300m of concrete bay saw cutting and sealing

  • 700m of asphalt joint saw cutting and sealing

  • 500mm diameter cores for security fence installation

LAML - DP World London Gateway
Previous
Previous

Airport Life Extention - Runway Preservation and Overbanding

Next
Next

Knock Airport Runway Remedial Works