DP World London Gateway
Works successfully delivered at DP World London Gateway.
Working collaboratively with our Client and key stakeholders our saw cut, sealing and coring works were phased to ensure that key programme dates were achieved whilst DP World Port operational certainty was maintained throughout. Our subcontract package included the following:
30,300m of concrete bay saw cutting and sealing
700m of asphalt joint saw cutting and sealing
500mm diameter cores for security fence installation